Two parts of the depth
A block retaining wall trench has to hold two things:
- The base pad: a layer of compacted crushed stone, commonly about 6 in (150 mm) deep, that spreads the wall's weight and keeps it level.
- The buried course or courses: part of the wall sits below the finished ground in front of it. This embedment stops the bottom of the wall from sliding out.
trench depth = base pad depth + buried block depth
How much of the wall to bury
A widely used rule of thumb for segmental block walls is to bury about 1 in for every 8 in of wall height, and never less than about 6 in. In practice that usually means one full course underground. Taller walls, walls on a slope and walls on soft soil need more. Always follow the block manufacturer's installation guide, which gives figures for its own system.
| Total wall height | 1 in per 8 in | Bury at least | Trench depth with 6 in base |
|---|---|---|---|
| 24 in | 3 in | 6 in | 12 in |
| 36 in | 4.5 in | 6 in | 12 in |
| 48 in | 6 in | 6 in | 12 in |
| 60 in | 7.5 in | 7.5 in | 13.5 in |
Round the buried depth up to a whole course of your block. With 6 in blocks, 7.5 in means two buried courses.
How wide to dig
The base should extend in front of and behind the block. A common rule of thumb is a trench twice as wide as the block is deep: about 24 in (600 mm) for a 12 in deep block, giving roughly 6 in of base in front and the rest behind. Behind that, leave room for a drainage zone of crushed stone, often about 12 in wide, for the full height of the wall.
Worked example
A planter wall 20 ft long with 2 ft showing, built from 8 × 16 in blocks. Three courses stand above ground and one is buried, for a total height of 32 in. The rule of thumb gives 32 ÷ 8 = 4 in of embedment, so the 6 in minimum applies. With 8 in blocks you cannot bury part of a course, so one full 8 in course goes below grade. The trench is 6 in of base plus 8 in of buried block: 14 in deep and about 24 in wide.
The retaining wall calculator counts the materials for this wall: 4 courses of 15 blocks, 63 blocks with 5 percent extra, 16 caps, and 2.72 cubic yards of gravel for the base pad and the drainage zone, roughly 3.8 tons.
Building the base
- Dig down to firm, undisturbed soil. Remove topsoil, roots and soft spots and replace them with compacted stone.
- Use crushed angular stone with fines for the pad (often sold as road base or crusher run). Some systems call for clean crushed stone instead; follow the manufacturer.
- Compact the pad in layers of a few inches with a plate compactor.
- Level the pad carefully along its length and front to back. The first course is the one that matters most.
- Step the base up in whole-course increments on sloping ground, rather than tilting it.
- Lay a perforated drain pipe at the back of the base, run to daylight or a drain.
Common mistakes
- Setting the first course on loose soil or on a thin, uncompacted base, so the wall settles unevenly.
- Skipping the buried course to save a row of blocks. The bottom of the wall then has little to stop it sliding.
- Backfilling with the excavated clay right against the blocks instead of free-draining stone.
- Leaving out the drain pipe, or running it uphill so water has nowhere to go.
When you need an engineer or permit
Many codes require a permit, and often an engineered design, for retaining walls over about 4 ft (1.2 m), usually measured from the bottom of the footing or base, not just the visible face. Engineering is also usually needed for any wall that holds back a slope, a driveway, parking, a pool or a building, regardless of height. Many block systems limit gravity walls without soil reinforcement to about 3 ft. Taller walls use layers of geogrid reinforcement in the backfill, designed for the soil and loads. Rules differ by city and county, so check local code before you dig. A wall that fails can cause serious injury and damage.
Metric quick reference
| Item | Common rule of thumb |
|---|---|
| Base pad depth | 150 mm compacted |
| Base pad width | about 600 mm |
| Minimum embedment | about 150 mm |
| Drainage zone behind wall | about 300 mm |
Frequently asked questions
How deep should the base be for a retaining wall?
A compacted crushed-stone pad about 6 in (150 mm) deep is a common rule of thumb for small block walls, with one course or more buried on top of it.
How much of a retaining wall should be underground?
A common rule of thumb is 1 in per 8 in of wall height, with a minimum of about 6 in. For most small walls that is one buried course.
Do I need concrete under a retaining wall block?
Most segmental block walls sit on a compacted gravel pad, not concrete, because gravel drains and can be leveled precisely. Follow the block manufacturer's guide and any engineered design.
Do the math for your own project.
Open the retaining wall calculator