A 20x20 slab poured 4 inches thick needs 4.94 cubic yards of concrete before waste. Order about 5.5 yards. At 6 inches, order about 8.25.

By Mohamed Elgamal · Published November 15, 2026

How many yards of concrete for a 20x20 slab comes down to one number you choose: thickness. The floor area is fixed at 400 square feet, so every extra inch of depth adds about 1.23 cubic yards.

The quick answer by thickness

20 × 20 slab thicknessExact volumeWith 10% extraTypical use
4 in133.3 cu ft = 4.94 cu yd5.43 cu ydPatio, shed base, two-car parking pad
5 in166.7 cu ft = 6.17 cu yd6.79 cu ydDriveway apron, garage floor with heavier vehicles
6 in200 cu ft = 7.41 cu yd8.15 cu ydWorkshop with heavy equipment, RV or trailer parking

The thickness column is common practice, not a design. A 20 × 20 garage slab usually sits on a compacted base and may need thickened edges or footings, which the local building department decides. The slab thickness guide covers what drives that choice.

Working it out step by step

Take a 4 inch slab, the most common choice for a detached garage floor or a patio of this size.

  1. Area: 20 ft × 20 ft = 400 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Volume: 400 × 0.333 = 133.3 cubic feet.
  4. Cubic yards: 133.3 ÷ 27 = 4.94 cubic yards.
  5. Add 10 percent for an uneven base and spillage: 4.94 × 1.10 = 5.43 cubic yards.

cubic yards = 20 × 20 × (thickness in ÷ 12) ÷ 27

A handy shortcut for this exact footprint: each inch of thickness is 400 ÷ 12 ÷ 27 = 1.23 cubic yards. Multiply by your thickness in inches to sanity-check any quote.

How many 80 lb bags for a 20x20 slab?

An 80 lb bag of premix yields about 0.60 cubic feet, so a full cubic yard takes 45 bags. For a 20 × 20 slab that adds up fast:

Thickness80 lb bags (10% extra)60 lb bags (10% extra)
4 in245326
5 in306408
6 in367489

Even with no waste allowance, a 4 inch slab is 223 bags of 80 lb mix, close to 18,000 lb of dry material to lift, haul and mix. A small crew with one mixer cannot keep a slab this size workable, and joints between batches weaken it. Bags make sense for a 20 × 20 only if you split it into separate pours at planned joints. For a single pour, order ready-mix.

Ordering ready-mix: what to tell the plant

  • Round up, not to the nearest. Many suppliers sell in quarter-yard or half-yard steps. For the 4 inch slab, 5.43 yards becomes 5.5. Ask how they round before you book.
  • One truck is usually enough. A full-size mixer truck typically carries roughly 8 to 10 cubic yards, so even the 6 inch version at about 8.25 yards fits in one load on most trucks.
  • Check the base before you trust the number. The calculation assumes a perfectly flat base. If the gravel sits 1/2 inch low across the whole slab, that is 400 × 0.5 ÷ 12 = 16.7 cubic feet, or another 0.62 cubic yards. Measure depth at several points across the forms before you call.
  • Tell them the job. Mention it is an exterior slab or garage floor so the plant can suggest a suitable mix for your climate, including air-entrained concrete where freeze-thaw is a concern.

Thickened edges add more than you think

Garage and shed slabs are often poured with a turned-down edge, a perimeter strip that runs deeper than the slab to carry the walls. Picture a 20 × 20 slab with an edge 12 inches wide that goes 8 inches below the slab bottom. The perimeter is 80 ft, so the extra concrete is about 80 × 1 × (8 ÷ 12) = 53.3 cubic feet, or 1.98 cubic yards. That turns a 5.5 yard order into roughly 7.5. The exact edge size comes from your plans or local code, so calculate it separately and add it to the slab.

Other common slab sizes compared

All at 4 inches thick, with 10 percent extra:

SlabAreaCubic yards80 lb bags
10 × 10100 sq ft1.3662
12 × 12144 sq ft1.9688
20 × 20400 sq ft5.43245
20 × 24480 sq ft6.52294
24 × 24576 sq ft7.82352

A 24 × 24 two-car garage poured 6 inches thick needs 11.73 cubic yards with waste, which may mean two trucks. For any other size, enter it in the concrete calculator; for odd shapes or footings, the cubic yard calculator handles the volume.

Metric equivalent

A 20 × 20 ft slab is about 6.1 × 6.1 m. At 4 inches (roughly 100 mm) it needs 4.15 cubic meters including 10 percent extra. Readers in Canada and Australia ordering by the cubic meter can switch the calculator to metric for the exact figure.

Before the truck arrives

  • Base: most slabs sit on a few inches of compacted crushed stone. A 4 inch layer under a 20 × 20 slab is another 4.94 cubic yards of loose material before compaction; the gravel calculator sizes it.
  • Reinforcement: wire mesh or a grid of rebar keeps cracks tight. Plan the layout with the rebar calculator.
  • Control joints: a common rule of thumb for a 4 inch slab is joints no more than 8 to 12 ft apart, so a 20 × 20 slab is usually cut into four 10 × 10 panels.
  • Permits and code: a garage or any slab that carries a building normally needs a permit and an inspection. The International Residential Code sets a minimum of 3.5 inches for concrete floor slabs, but local rules, frost depth and soil can require more. Check with your building department first, and get engineering advice for anything heavy or structural.
  • Safety: wet concrete is caustic. Wear waterproof gloves, boots and eye protection, and wash skin that it touches right away.

Frequently asked questions

How many yards of concrete do I need for a 20x20 slab?

At 4 inches thick, 4.94 cubic yards before waste and 5.43 with 10 percent extra, so order 5.5 yards. At 5 inches it is 6.79 yards with waste, and at 6 inches 8.15 yards.

How many bags of concrete for a 20x20 slab 4 inches thick?

About 245 bags of 80 lb premix or 326 bags of 60 lb premix, including 10 percent extra. That much weight is why most people order ready-mix for a slab this size.

How much concrete for a 20x20 slab 6 inches thick?

200 cubic feet, which is 7.41 cubic yards, or 8.15 cubic yards with 10 percent added. That still fits in one full-size mixer truck in most cases.