Indoor projects go wrong in two ways: running short halfway through, or buying a pile of extra boxes that cannot be returned. The fix is the same for every material. Measure the surface, subtract what the material really skips, add the waste that suits the layout, and round up to whole packages. Tile, flooring and wallpaper also need to come from the same batch or dye lot, so buying enough the first time matters more than for most materials.
Where to start
- Walls: drywall sheets first, then joint compound, primer and paint. Paint coverage comes from the can label, so enter yours.
- Floors: flooring or carpet by area with a cut allowance, then tile setting materials such as thinset and grout if you are tiling.
- Finishing: crown molding angles and a backsplash, measured as the strip of wall between counter and cabinets.
- Outside surfaces: house paint and deck stain are here too, since both are bought by coverage per gallon.
Before sanding or removing old paint, flooring or ceiling texture in a home built before 1978 in the US, test for lead, and for asbestos in older textured ceilings, flooring and adhesives where your local rules call for it.