Masonry is heavy, so mistakes are expensive in both directions. Short-ordering ready-mix can leave a cold joint in a slab, and every extra pallet of block or bag of mix has to be moved by hand. The calculators here work from the shape you are building to the volume or count you need, then add a margin for spillage, uneven ground and breakage.
Where to start
- Poured concrete: use the concrete calculator for slabs and footings. It converts to cubic yards and to 40, 60 or 80 lb bags, so you can see when ready-mix makes more sense than bags.
- Walls: block and brick are counted from the wall face, then mortar is added. Plan wall lengths and heights around the block module to keep cuts down.
- Patios and paths: pavers need a compacted gravel base and a bedding layer as well as the pavers themselves, so work out all three.
Retaining walls over a few feet high, walls that carry a structure and any foundation work are structural. Check local code, and have an engineer design walls that hold back soil. Wear gloves and eye protection with wet concrete, which can burn skin.